In short: plan a new kitchen in this order — how you use the room, the layout, appliances, then units and worktops, and finally finishes. On site, the usual sequence is strip-out, first-fix plumbing and electrics, plastering, flooring (often), units, worktop templating and fitting, tiling, second fix and decorating. Most kitchen fits take one to three weeks, depending on the size and whether walls are moved.
A new kitchen is a big investment and you will use it every day, so it is worth getting the planning right. Whether you are updating a galley kitchen in a Gateshead terrace or knocking through to create an open-plan kitchen-diner in Newcastle, this guide explains how to plan your kitchen and what happens during the fit, so there are no surprises.
Step 1: Think about how you use the room
Before looking at door colours, think about how your household actually uses the kitchen. Do you cook every night or mostly heat things up? Do the children do homework at the table? Do you need space for a washing machine and tumble dryer, or could they go in a utility room? Answering these questions first stops you choosing a kitchen that looks good but does not work.
Step 2: Choose a layout
- Galley — units on one or both sides; efficient for narrow rooms common in North East terraces.
- L-shaped — flexible and works well with a dining table.
- U-shaped — plenty of worktop and storage in a medium-sized room.
- Island or peninsula — great for open-plan rooms, but needs enough space to walk around comfortably.
Designers often talk about the “working triangle” between the sink, hob and fridge. You do not need to follow it rigidly, but keeping those three close, without a door or walkway cutting through, makes cooking much easier.
Step 3: Decide on appliances early
Built-in ovens, hobs, extractor hoods, dishwashers, fridges and washing machines all have specific sizes and need the right power, water and waste connections. Choose them before the kitchen design is finalised so the units fit around them. Remember:
- Any work on a gas hob or gas supply must be carried out by a Gas Safe registered engineer — it is a legal requirement.
- Induction hobs and electric ovens often need their own dedicated circuit, installed and certified by a qualified electrician.
- A cooker hood should be ducted to the outside where possible; recirculating hoods are a compromise.
Step 4: Units, worktops and storage
Kitchen units come in a huge range of styles and qualities. Look at the carcass (the box), the hinges and drawer runners, not just the doors — that is where cheaper kitchens let you down. For worktops, laminate is affordable and hard-wearing, solid wood is warm but needs care, and quartz or other stone-type surfaces are premium and very durable, but they are made to measure after the units are fitted.
Plan storage carefully: deep pan drawers, corner solutions, tall larder units and space for bins all make a big difference day to day.
Step 5: Lighting, sockets and finishes
Good lighting transforms a kitchen: ceiling lights for general light, under-cabinet lighting for worktops, and pendants over an island or table. Plan more sockets than you think you need, including some above the worktop for small appliances. Then choose splashbacks, tiles and flooring to finish the look.
What happens during a kitchen fit?
- Strip-out — the old kitchen is removed and services are made safe.
- First fix — new pipework, waste, electrics and any gas are run to the new positions.
- Building work and plastering — any walls are removed or built, and walls and ceilings are re-plastered.
- Flooring — tiled floors are often laid before the units go in.
- Units — base and wall units are fitted level and secure.
- Worktops — laminate and wood tops are fitted straight away; stone and quartz are templated and usually installed one to two weeks later.
- Tiling and splashbacks.
- Second fix — sink, taps, appliances, sockets and lights are connected and tested.
- Decorating and handover.
Living without a kitchen
You will usually be without a working kitchen for at least part of the fit. Setting up a temporary space with a kettle, microwave and fridge elsewhere in the house makes life much easier. A good builder will keep you informed about which days you will have no water or power in the kitchen.
Removing a wall for an open-plan kitchen
Knocking through to the dining room is popular in older North East homes. If the wall is load-bearing, it will need a structural engineer’s calculations, a steel beam and Building Regulations approval. It is very achievable — it just needs planning in from the start. Our extensions and structural work page explains how we handle knock-throughs and steel beams.
Kitchen fitting in Newcastle, Gateshead and the North East
Our team handles every part of a kitchen fit — strip-out, plumbing, plastering, tiling, flooring and fitting — with qualified electricians and Gas Safe engineers for the work that needs them. That means one team, one schedule and one point of contact. Book your free visit and written quote today.
Frequently asked questions
How long does it take to fit a kitchen?
Most kitchen fits take one to three weeks, depending on the size of the kitchen and whether walls are moved. Stone or quartz worktops are usually fitted one to two weeks after the units.
Who can connect a gas hob?
Only a Gas Safe registered engineer can legally carry out work on a gas hob or gas supply.
Can I knock through to make an open-plan kitchen?
Usually, yes. A load-bearing wall needs a structural engineer's calculations, a steel beam and Building Regulations approval.
Should the floor go down before the kitchen units?
Tiled floors are often laid before the units are fitted. Other floor finishes may be fitted afterwards — your fitter will advise.